EPC + By PSD Energy

Because Every Electrical Infrastructure Project Has Changes.
And Changes Need Control.

Control Project Progression On Your Terms

Control Project Progression On Your Terms

For over 20 years, PSD Energy has pioneered the EPC+ approach - redefining how projects adapt to change with minimal disruption. We maintain secure, in-house control over the most critical project elements: Engineering, Procurement, Construction, (+) Manufacturing and System Integration.

This end-to-end capability eliminates reliance on third parties and their schedules. As a PSD Energy client, your project is always the priority.

Genuine Competitive Advantages

Genuine Competitive Advantages

Choosing PSD Energy means benefiting from our client-first culture. Everyone at PSD Energy is empowered to be problem solvers and thinkers, equipped with the internal resources to tackle Australia’s most complex and interconnected challenges. This unique combination of talent, culture, and sovereign capabilities positions your project for success, allowing it to progress and be delivered on your terms.

Sovereign Manufacturing For Agile Project Changes

Sovereign Manufacturing For Agile Project Changes

To meet the demands of your schedule, our in-house manufacturing ensures every change is managed throughout the entire lifecycle process. This provides a significant advantage, enabling changes without relying on external parties and their schedules. With PSD Energy, you are our top priority, ensuring speed, quality, and control to deliver your project to energisation with certainty.

In-House Teams, Capabilities And Capital Equipment With EPC +

Engineering

Engineering

Procurement

Procurement

Construction

Construction

+ Manufacturing & System Integration

+ Manufacturing & System Integration

Benefits

Control

No reliance on third-parties to deliver energisation to your schedule.

Opportunity

Optimise footprint, reveal hidden costs and improve teams.

Certainty

No onsite surprises or post project regrets.

How A Recent BESS Project Benefited From EPC +

The Situation: A Major Design Change Threatened To
Derail Time To Energisation

The original project brief presented a significant hidden engineering challenge: off-board high-voltage switchgear protection was to be mounted on separate control panels in a different building. As the project advanced, it became clear that this setup created major issues with external control cabling.

undefined 1

Engineering

Our design engineers swiftly re-evaluated the layout and proposed a more efficient way of relocating the control panels into the same building as the switchgear.

PSD Energy National Engineering Capacity: +100 multi discipline engineers.

Engineering 1

Procurement

The procurement activities were closely integrated with the updated engineering requirements. By controlling every aspect of the supply chain, we ensured all necessary components-such as control panels and cabling-were sourced, delivered, and aligned with the revised project design without causing delays.

This tight coordination minimised supply chain risks, ensuring materials and equipment matched the new configuration while keeping costs under control.

PSD Energy Procurement Practices: Continual training with global OEMs to understand the capabilities of different technologies and how to build the optimal solutions for clients.

Procurement 1

Construction

With both engineering and procurement fully aligned, PSD Energy’s construction team was able to implement the revised plans without disrupting the overall project timeline. The construction scope included:

  • Relocating the control panels to the switchgear building.
  • Updating cabling schedules and physical layouts.
  • Adjusting the building assembly to accommodate the design changes.

By leveraging a single team for all construction activities, we maintained consistency and avoided any miscommunication between disciplines.

PSD Energy Construction Capabilities: In-house electrical, mechanical and civil equipment and skills are delivered nationally, with a fleet of over 200 vehicles, plant and equipment.

Construction 1Construction 2

+ Manufacturing & System Integration

The “+” in EPC+ represents PSD Energy’s unique capabilities for seamless adaptability, integrated teamwork, and a solution-oriented culture.

This project exemplifies the “+” in action:

Adaptability:
Rapidly re-engineering and implementing design changes without impacting timelines or budgets.

Integration:
A single, cohesive team managing the entire project lifecycle-from engineering to final assembly.

Solution Delivery:
A focus on solving client challenges proactively, ensuring energisation milestones are achieved.

+ Manufacturing & System Integration 1+ Manufacturing & System Integration 2

PSD Energy were exceptional throughout the project, from first engagement to the post-project debrief. As challenges and changes arose, their team responded quickly and provided clear, actionable answers.

The value of the post-project truth session was evident through the knowledge and continual improvement they shared from other projects. I have no doubt our project will now contribute to helping future PSD Energy clients.